← Back to Groq History
minor✓ Resolved
Data Center Failure Impacting Capacity - DMM1
Status
resolved
Duration
Duration unavailable
Updates
4
Coverage
0 articles
INCIDENT TIMELINE
✓ Resolved
This incident has been resolved.
resolved
**The data center capacity issue has been resolved. All services are operating at normal capacity. The incident was caused by a failed ARP entry on the network gateway device caused the Salam network link to go down in the DMM1 data center, which has been addressed. We apologize for the disruption and appreciate your patience.**
monitoring
We have restored capacity in DMM 1 and services are beginning to recover. Users should gradually see network performance return to normal. We’re now monitoring the infrastructure to ensure stability.
identified
We have identified a failure in our DMM1 infrastructure that is causing reduced capacity and network latency. The team has isolated the cause to the Salam link confirmed down and the Mobily link operating at full capacity, resulting in significant packet loss and is working on restoring capacity. Users continue to see Network latency.
investigating
We are currently investigating a potential network issue at our DMM1 that is impacting system capacity. Users may experience slower response times or intermittent failures due to reduced resources. Our engineering team is working to identify the root cause and remediate the problem.
📊 TECHNICAL DETAILS
Internal ID
c6b520f4-3909-4a18-bcd9-ccf8e7a2cffd
External ID
01KCNJCXJRRZB6WJE7A844VE3Q
🕐 First reported
🔄 Last Updated
✓ Resolved
MINOR
Impact Level
Duration unavailable
Total Duration
4
Status Updates
REQUEST COVERAGE
No article has been written for this incident yet. When 100 people request coverage, we request generation of one.
0 / 100 requests100 more needed